Notice on effectively doing a good job in the summer heat period and flood construction safety work
Published:
2019-12-18
Source:
Author:
Each city (district) in charge of construction administration, all relevant construction, construction and supervision units:
Summer and rainy season has come, by this year's meteorological year peculiarities, all kinds of factors that induce production safety accidents gradually increased, the work of production safety into the accident-prone period. At the same time, with the approach of the National Day, a series of major activities to celebrate the 70th anniversary of the founding of the country will be launched one after another. In order to create a good production safety environment, effectively do a good job in the city's construction safety work, reduce all kinds of safety accidents, to protect the personal safety and health of construction site operators, in accordance with the "Provincial Department of Housing and Urban-Rural Development on effectively doing a good job in the summer high temperature period safety production work notice" (Su Jian Chuan [2019] No. 15), "forwarded to the Provincial Safety Committee on effectively doing a good job in the summer safety production work Notice" (Chang'an Office [2019] No. 18) and other requirements, is to do a good job in the city's summer high temperature period and flood construction safety work notice as follows:
A, fully understand the situation, and further enhance the sense of responsibility and urgency to grasp the work of construction safety production
This year, the province's production safety situation is quite serious, in less than a month's time, two consecutive construction safety production accidents, triggering a larger social impact, the city's construction safety production situation is not optimistic. The construction administrative departments, construction safety supervision agencies must firmly establish the concept of safe development and "hidden danger is an accident", to further strengthen the red line awareness and bottom line thinking, in strict accordance with the Ministry of Housing and Construction, the provincial Department of Housing and Construction requirements to continue to carry out safety inspections and hidden danger investigation and rectification in the field of construction, will be dangerous large projects, attached lift Scaffolding and formwork support system, work at height, lifting machinery and equipment safety management as a strict investigation of the content, increase the frequency of inspections and penalties, resolutely prevent accidents above the larger, strictly control the general accident, to ensure that the city's high temperature and flood construction safety situation is stable.
Second, to further raise awareness and effectively implement the main responsibility for safety production
Summer has always been the construction safety accident-prone season, the construction units must pay great attention to the adverse effects of extreme weather on construction safety, enhance the sense of responsibility and urgency of construction safety work, for the summer high temperature, flood safety production characteristics, strengthen organizational leadership, careful deployment, and strict implementation of the main responsibility of all parties. Advocate the "three hearts" concept, set up a "hidden danger is the accident" to strengthen the safety pre-control and hidden danger investigation double mechanism, based on flood control, typhoon, fire prevention, heat, poisoning, early deployment, early launch, early preparation, and effectively put the flood and summer construction safety Production work to an important position, take practical measures to find hidden dangers in a timely manner, eliminate hidden dangers, the existence of the problem in a timely manner pin closure.
Third, the implementation of measures, and seriously do a good job of summer heat control work
1. Reasonable arrangements to adjust the work and rest time. The construction, construction units should pay close attention to the high temperature weather forecast, according to the actual temperature, the strict implementation of the "do both, rest in the middle" to avoid high temperature measures, appropriate adjustment of work shifts and working hours, and try to avoid open-air outdoor work during high temperature hours. Construction sites should arrange management personnel to work with the shift.
That is: when the temperature reaches 35 ℃ or more, 11:00 to 15:00 between the operator is not arranged to engage in direct exposure to the sun under the construction, not to mention the outdoor open-air work overtime; when the maximum temperature reaches 40 ℃ or more, the construction should be stopped.
2 improve the construction site operating environment. During high temperatures, construction companies should be equipped with front-line construction personnel with breathable helmets, towels, cool oil and tea in line with health standards and other necessary heat protection supplies; workplace should take effective ventilation, heat insulation, cooling measures to minimize the work at height and deep pits; older, poor physical fitness, do not adapt to high-temperature operations should be promptly transferred to the post.
3. Strengthen food safety and health epidemic prevention management. All construction enterprises and project departments should strictly implement the national food hygiene and safety management system, cooking staff should be licensed to work, the canteen must obtain a health license to prevent food poisoning; pay attention to the staff living area of the summer heat and health epidemic prevention work to ensure that the construction staff dormitory, canteen, toilets, showers and other temporary facilities meet the standard requirements and meet the needs of summer heat; site site, living areas to remove the living in a timely manner Garbage should be removed from the site and living area in time, and mosquitoes and flies should be killed regularly to prevent infectious diseases and ensure the personal health and safety of construction workers.
4. Strengthen the site fire prevention, strict fire approval. The construction site should strengthen the site fire prevention during the high temperature, strictly implement the fire application approval system, and strengthen the supervision of the use of open fire; temporary electricity in the dormitory area should ensure reliable insulation, the dormitory should be equipped with independent leakage, overload, short-circuit protection devices, the use of liquefied gas and high-power electrical appliances is strictly prohibited, while in accordance with the requirements of the "Technical Specification for Fire Safety in Construction Sites of Construction Projects", the construction site and the At the same time, in accordance with the requirements of the Technical Code of Fire Safety for Construction Sites, conduct a comprehensive inspection of the fire safety and fire fighting facilities of the construction site and living area to completely eliminate fire hazards.
5. Enhance the awareness of the workforce to prevent heatstroke. Construction companies should organize the publicity and education on heat stroke and heat stroke first aid knowledge, and carry out training and learning on heat stroke prevention in hot weather, so that construction workers understand the basic knowledge to prevent heat stroke, master the knowledge of accident prevention and rescue, enhance the awareness of safety and protection against heat stroke in hot weather and first aid capabilities, and seriously implement in construction operations.
Fourth, strengthen the investigation, and effectively eliminate the hidden dangers of flood safety
Construction, construction, supervision units to regularly carry out a comprehensive inspection of the construction projects under construction, increase the flood safety hazard investigation and rectification of the project under construction, especially to do a good job of monitoring and inspection of key parts of the site. First, deep pits, high side slope project flood control. To increase deep pits, high slope construction management inspection, strict implementation of deep pits, high slope design program expert review system; strict implementation of pits, slope construction section excavation, section support management requirements, strengthen the quality of support structure management, strictly prevent safety accidents caused by the quality of construction. Second, the safety of scaffolding and tall formwork support system. To standardize the scaffolding and formwork support system erection and removal, scaffolding and formwork support system for regular inspection, focusing on the inspection of scaffolding foundation, frame, pull nodes and external pick safety flat net and other key parts, the hidden problems found timely organization for rectification. Third, the construction of temporary electricity safety. A variety of open-air use of electrical equipment should be higher and dry place to place; total distribution box, sub-distribution box, switch box, etc. should be reliable rain protection measures; all kinds of temporary power lines without leakage, corrosion, loosening and other phenomena; site electrical equipment grounding, grounding protection measures should be secure, leakage protection device should be sensitive and effective; storm and other dangerous situations before the arrival of the construction site temporary power in addition to lighting, drainage and emergency power. Other power supply should all be cut off. Fourth, the crane equipment flood control. To implement regular maintenance of lifting equipment, inspection system to ensure that the tower crane, construction elevator and other lifting equipment in good safety condition. Five is the high work, fence safety. To work on the high side of the edge, hole safety protection for a comprehensive survey to ensure that the edge, hole protection facilities are complete, solid and reliable; to strengthen the safety education of the staff working at high places, improve the correct use of safety belts, helmets and other protective gear self-protection awareness. To strengthen the construction of the site and the wall fence flood safety inspection, to ensure that the construction of the board and wall fence is solid and reliable, and evacuate the site in a timely manner in case of emergencies.
Fifth, improve emergency duty, timely and proper handling of emergencies
According to the summer, flood construction characteristics, the relevant enterprises to develop and improve the corresponding preventive measures and emergency disposal plan. First, do a good job after the meteorological department issued a relevant warning response, according to the high temperature warning, weather changes and other circumstances reasonable arrangements, the implementation of preventive measures, especially when encountering abnormal high temperatures, heavy rain and other extreme weather, to take timely measures to stop construction, evacuation of personnel. Second, do a good job of emergency disposal of various types of unexpected accidents. Targeted development of heat stroke, food poisoning first aid emergency plan, the implementation of responsibility, so that personnel in place, responsibility in place, work in place, once the emergencies, in accordance with the plan to deal with and do a good job afterwards. Third, the strict implementation of the summer heat, flood duty system and accident reporting system, each unit to ensure 24-hour communication, once the safety accident, in accordance with the relevant provisions of timely reporting, proper handling, late reporting, omission and concealment is strictly prohibited.
Sixth, strict management, to ensure that the summer, flood construction safety situation is stable
The construction company project department for the summer, flood construction characteristics, combined with the actual situation of the project preparation of flood control, anti-high temperature program, self-correction, serious investigation, rectification of all kinds of safety hazards on site, the program and investigation and rectification reported to the company headquarters in a timely manner; supervision unit should strengthen the construction site flood control, heat control and site safety protection work to check the implementation; construction units should supervise Construction, supervision and other units to do a good job in the summer, flood-related safety work and give strong support and cooperation, not to the construction unit to make unreasonable rush requirements; construction administrative departments at all levels and building construction safety supervision agencies to carry out solid summer high temperature, flood construction safety supervision and sampling work, supervise the construction, construction, supervision and other enterprises to fulfill the main responsibility for safety production, and effectively implement the requirements of this notice To prevent all kinds of safety accidents, the inspection found in the major safety hazards or rectification is not effective, to take stop work, credit deduction, administrative penalties and other measures, strict and serious investigation and punishment, and strive to promote the city's construction safety situation continues to steadily improve.

Address: No.151, Dongfang East Road, Qishuyan District, Changzhou City
Tel: 0086-15051981888
Fax: 0086-519-88406777
Email: 13901505022@163.com
copyright © 2023 Jiangsu Baosen Construction Engineering Co., Ltd
powered by:www.300.cn | Tags Business license Support for IPV6